KINMY / APPLICATIONS

Water Meter Testing
for Your Application.

From production testing to laboratory calibration, start with the work your system needs to do. Explore testing needs for meter manufacturers, water utilities and metrology laboratories.

Explore Test Systems
KINMY workshop with water meter testing equipment during system assembly and testing
KINMY workshop · System assembly and testing

Different Workflows.
Specific Testing Needs.

The right configuration starts with your meters, test procedure and required capacity.

Meter Manufacturers

Plan water meter testing around the meter models you produce and the checks required in your production process.

  • Meter sizes, connections and model changes
  • Test points and meters per batch
  • Daily testing volume and operator workflow

Water Utilities

Define a testing workflow for incoming meters or meters returned from service, based on your inspection procedures.

  • Meter types and sizes in your network
  • Sampling plans and test flow points
  • Available space and expected workload

Metrology Laboratories

Discuss a calibration setup around your measurement procedure, required flow range and uncertainty target.

  • Calibration method and reference instruments
  • Test conditions and uncertainty requirements
  • Applicable standards and reporting needs
LET’S DISCUSS YOUR APPLICATION

Start with Your
Testing Task.

Tell us what you test, which procedure you follow and how many meters you need to handle. We can then discuss a suitable system configuration.

Leave a Message