TECHNOLOGY
Technology
Understand common reference methods, measurement workflows and automation concepts used when planning a water meter testing system.
OVERVIEW
Plan the System Around the Actual Task
Use this section to explain the verified application, method or product information. Replace the wording and images directly in Elementor as project information is confirmed.
PROJECT INPUT
Information That Helps Define the System
01
What to Test
Define the meter, component or measurement task before choosing the equipment arrangement.
02
How to Test
Confirm the applicable procedure, reference method, test points and operating conditions.
03
How to Work
Confirm throughput, operator workflow, automation, data recording and reporting requirements.
START WITH YOUR REQUIREMENT
Tell Us What You Need to Test.
Share the meter or device, test method, range, capacity and automation requirements. KINMY can then discuss a suitable system configuration.